
Management of a project for a multifunctional complex — housing, offices and service buildings with a total gross built-up area of approximately 220,000 m², together with the complete accompanying engineering infrastructure. Urban planning procedures were carried out and partial infrastructure was built, including a railway stop on the Sofia–Kulata line along the southern boundary of the site — built and operational to this day. Pre-design studies were prepared for alternative development scenarios. By decision of the investor the project was temporarily frozen and, in 2020, sold. Proof that project management also covers the strategic turns: conservation, repositioning and preparing the asset for a transaction.
Zelenika — multifunctional complex, approx. 220,000 m² GBA (2007–2020)